Carlsbad Desal Plant
  • Home
  • Desal 101
    • How it Works
  • News
    • Media Portal
  • Environmental
    • EIR
  • FAQs
    • Process FAQs
    • Environmental FAQs
  • About
    • Who We Are
    • What We Do
    • How We Do It
    • Construction >
      • Mitigation
      • Intake and Outfall
      • Pipeline Overview
      • Desal Plant
      • Construction Team
  • Contact
    • Visit
    • Careers
    • Privacy policy

News 

STEAM: Making Ocean Water Drinkable

3/16/2022

0 Comments

 
CBS Los Angeles
0 Comments

Carlsbad Desalination Plant Shields Region From Megadrought

3/16/2022

0 Comments

 
Water News Network
As the worst drought in 1,200 years grips the West, the Claude “Bud” Lewis Carlsbad Desalination Plant is protecting the San Diego region with 50 million gallons a day of drought-proof water.
Completed in 2015, the plant was built before the period of increasing inflation that’s driving up prices for water infrastructure projects that are just starting. That means the desal plant is safeguarding the region’s economy and quality of life today at a lower cost than it would be to build now.                                                                                        Read more. 
0 Comments

Carlsbad Desalintion Plant Cuts Output to Conserve Electricity Amid Heat Wave

8/19/2020

0 Comments

 
TIMES OF SAN DIEGO
By Chris Jennewein 

CARLSBAD - The San Diego County Water Authority said Tuesday production has been cut back at the Claude “Bud” Lewis Carlsbad Desalination Plant to conserve electricity and prevent rolling blackouts during the statewide heat wave.

​The plant operated by Poseidon Water relies on electricity to convert seawater to drinking water, using a lot of power still but less than 1% of the peak energy demand in the San Diego Gas & Electric service area.
Starting Monday, the plant reduced output, making an additional 8 megawatts of power available for other uses. Further load reduction is possible if necessitated by the heat wave.

Read More
0 Comments

New Seawater Intake Pumps Preserve Marine Environment, Enhance Climate-Resilient Water Supply

7/23/2020

0 Comments

 
Picture
Carlsbad Desalination Plant Improves Sustainability

Carlsbad, Calif. (July 22, 2020) –  New fish-friendly seawater intake pumps recently commissioned at the Carlsbad Desalination Plant are among the most environmentally advanced intake pumps in the world.
 
The three intake pumps, manufactured by Indar, are part of a broader effort to ensure the long-term health of the marine environment near the Claude “Bud” Lewis Carlsbad Desalination Plant, which sits on the shores of Agua Hedionda Lagoon.


Read More
0 Comments

Carlsbad desalination plant locked down amid coronavirus pandemic

3/21/2020

0 Comments

 
LOS ANGELES TIMES
By 
PHIL DIEHL


Carlsbad — As of Friday, 10 workers are quarantined inside the Carlsbad desalination plant for the next three weeks, monitoring and adjusting gauges and switches, watching for leaks, and doing whatever is needed to safeguard San Diego County’s only significant local source of drinking water.
​
“We asked some employees to be locked down at the plant for 21 days to isolate the risk of infection,” said Gilad Cohen, chief executive of IDE Americas, the global company that operates the Claude “Bud” Lewis Carlsbad Desalination Plant and others around the world.
The request for volunteers was a precaution against the spread of the COVID-19 pandemic.

Read More
0 Comments
<<Previous

    ​What's the latest?


    ​Jessica H. Jones

    ​Director of Communications
    Poseidon Water

    (760) 655-3998
    Contact

    ​Read news releases, newspaper articles and other bulletins about the Carlsbad Desalination Project and related topics here. Check back often for updates.
    Picture

    Categories

    All
    Awards And Accolades
    Construction Updates
    News Coverage
    News Release
    Press Releases

    Archives

    March 2022
    August 2020
    July 2020
    March 2020
    October 2019
    September 2019
    May 2019
    February 2019
    January 2019
    December 2018
    October 2017
    April 2017
    December 2016
    November 2016
    July 2016
    June 2016
    April 2016
    December 2015
    June 2015
    October 2014
    September 2014
    June 2014
    May 2014
    April 2014
    January 2014
    October 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    January 2012
    October 2011
    September 2011
    August 2011
    June 2011
    February 2011
    December 2010
    June 2010
    May 2010
    April 2010
    March 2010
    February 2010
    January 2010

    RSS Feed

HOME | DESAL 101 | NEWS | ENVIRONMENTAL | FAQS | ABOUT | CONTACT
© 2017 Carlsbad Desalination Project : 5780 Fleet Street, Suite 140, Carlsbad, CA 92008 | (760) 655-3900
​All Rights Reserved. Contact | Login.
  • Home
  • Desal 101
    • How it Works
  • News
    • Media Portal
  • Environmental
    • EIR
  • FAQs
    • Process FAQs
    • Environmental FAQs
  • About
    • Who We Are
    • What We Do
    • How We Do It
    • Construction >
      • Mitigation
      • Intake and Outfall
      • Pipeline Overview
      • Desal Plant
      • Construction Team
  • Contact
    • Visit
    • Careers
    • Privacy policy