Carlsbad Desal Plant
  • Home
  • Desal 101
    • How it Works
  • News
    • Media Portal
  • Environmental
    • EIR
  • FAQs
    • Process FAQs
    • Environmental FAQs
  • About
    • Who We Are
    • What We Do
    • How We Do It
    • Construction >
      • Mitigation
      • Intake and Outfall
      • Pipeline Overview
      • Desal Plant
      • Construction Team
  • Contact
    • Visit
    • Careers
    • Privacy policy

EIR

Environmental Impact Report

​Environmental Impact Report: Table of Contents
Chapter 1: Executive Summary
Chapter 2: Introduction
Chapter 3: Project Description
  • Figure 3-1
  • Figure 3-2
  • Figure 3-3
  • Figure 3-4
  • Figure 3-5
  • Figure 3-6
  • Figure 3-7
Chapter 4.1: Environmental Analysis: Aesthetics
  • Figure 4.1-1
  • Figure 4.1-2
  • Figure 4.1-3
  • Figure 4.1-4
  • Figure 4.1-5
Chapter 4.2: Environmental Analysis: Air Quality
Chapter 4.3: Environmental Analysis: Biological Resources
  • Figure 4.3-1
  • Figure 4.3-2 - coming soon.
  • Figure 4.3-3
  • Figure 4.3-4
  • Figure 4.3-5
  • Figure 4.3-6
  • Figure 4.3-7- coming soon.
  • Figure 4.3-8- coming soon.
  • Figure 4.3-9
  • Figure 4.3-10
  • Figure 4.3-11
Chapter 4.4: Environmental Analysis: Cultural Resources
  • Figure 4.4-1
  • Figure 4.4-2 - coming soon.
Chapter 4.5: Environmental Analysis: Geology and Soils
  • Figure 4.5-1
Chapter 4.6: Environmental Analysis: Hazards and Hazardous Materials
Chapter 4.7: Environmental Analysis: Hydrology and Water Quality
  • Figure 4.7-1
  • Figure 4.7-2
Chapter 4.8: Environmental Analysis: Land Use/Planning
  • Figure 4.8-1 - coming soon.
Chapter 4.9: Environmental Analysis: Noise and Vibration
Chapter 4.10: Environmental Analysis: Transportation and Traffic
  • Figure 4.10-1
Chapter 4.11: Environmental Analysis: Public Utilities and Service Systems
Chapter 5: Cumulative Impacts
Chapter 6: Alternatives to the Proposed Action
Chapter 7: Effects Found not to be Significant
Chapter 8: Significant Irreversible Environmental Changes
Chapter 9: Growth-Inducing Impacts of the Proposed Action
Chapter 10: List of Preparers
Chapter 11: References
Appendix A: NOP/Comments
Appendix B: Water Purchase Agreement
Appendix C: Project Application Materials
  • Alternatives to the Proposed Intake - coming soon.
Appendix D: Air Quality Technical Report - coming soon.
Appendix E: Biological Resources Studies
  • Salinity Tolerance Investigations: A Supplemental Report for the Carlsbad, CA. Desalination Project - coming soon.
  • Marine Biological Considerations Related to the Reverse Osmosis Desalination Project at the Encina Power Plant, Carlsbad, CA
  • Marine Biological Considerations Related to the Reverse Osmosis Desalination Project at the Encina Power Plant, Carlsbad, CA - FIGURES
  • Toxicity Testing of the Concentrated Discharge of the Carlsbad Seawater Desalination Plant
  • Carlsbad Desalination Facility - Intake Effects Assessment
  • Hydrodynamic Modeling of Dispersion and Dilution of Concentrated Seawater Produced by the Ocean Desalination Project at the Encina Power Plant, Carlsbad, CA - coming soon.
  • Hydrodynamic Modeling of Dispersion and Dilution of Concentrated Seawater Produced by the Ocean Desalination Project at the Encina Power Plant, Carlsbad, CA, Part II: Saline Anomalies Due to Theoretical Extreme Hydraulic Scenarios
Appendix F: Cultural Resources Survey Report
  • Site Update Documents
Appendix G: Geotechnical Studies
Appendix H: Hazardous Waste Database Search
Appendix I: Noise Technical Report
Responses to Comments - Table of Contents
Comments 1 - 7
Comments 8 - 30
Comments 31 - 42 - coming soon.
Comments 43 - 49
Comments 50 - 54
Comments 55 - 56
Comments 57 - 59
First EIR 2009 Addendum
Second EIR 2012 Addendum
MMRP for Second Addendum 2012
HOME | DESAL 101 | NEWS | ENVIRONMENTAL | FAQS | ABOUT | CONTACT
© 2017 Carlsbad Desalination Project : 5780 Fleet Street, Suite 140, Carlsbad, CA 92008 | (760) 655-3900
​All Rights Reserved. Contact | Login.
  • Home
  • Desal 101
    • How it Works
  • News
    • Media Portal
  • Environmental
    • EIR
  • FAQs
    • Process FAQs
    • Environmental FAQs
  • About
    • Who We Are
    • What We Do
    • How We Do It
    • Construction >
      • Mitigation
      • Intake and Outfall
      • Pipeline Overview
      • Desal Plant
      • Construction Team
  • Contact
    • Visit
    • Careers
    • Privacy policy